Shoreland Permit by Notification
Shoreland Permit by Notification is the streamlined NHDES route for smaller projects near New Hampshire's lakes, ponds and rivers. South Road Designs prepares these filings and helps with shoreland permits for qualifying projects. When the project includes a septic system, the same person handles the design and the shoreland paperwork.
Free ConsultationWhat Counts as the Protected Shoreland
The protected shoreland is the land within 250 feet of the reference line of public waters covered by the Shoreland Water Quality Protection Act. Most construction, excavation and fill there needs a shoreland permit from NHDES. The NHDES Wetlands Permit Planning Tool shows whether your property falls inside the line.
Permit by Notification or a Standard Permit
Smaller projects that stay within NHDES limits on disturbed area and new impervious surface can use Permit by Notification. Larger projects need a standard shoreland permit. Jason looks at your project and site to see which one applies.
Waterfront Home Sales and Septic Systems
Since September 1, 2024, the buyer of a developed waterfront property needs a licensed septic system evaluator to evaluate the system before the sale, or must agree to replace it, when part of the system is in the protected shoreland. A failed system has to be replaced within 180 days of the sale. Systems with no State approval, or approved before September 1, 1989, also need a permitted septic designer to find the bottom elevation of the disposal area.
Design and Permits From One Designer
A waterfront replacement often needs a failed septic system design and a shoreland permit at the same time. South Road Designs prepares the septic design and the Permit by Notification filing and helps with standard shoreland permits, so the plans and the permit match. See each step on the design process page.



